BC Biomedical IPA-2000S Manual de usuario Pagina 149

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 162
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 148
6-11
STEP 6
9
NOTES:
CThe Ground Leakage and Chassis
Leakage Current Test will be run the
same as above, only the DUT will be
ON.
CThere may be instances when the
DUT power is on but the unit continues
to request it be turned on. Since there
is a certain amount of current running
through the DUT even when the power
is off, the unit determines whether the
unit is on by looking at the differential
between the on and off currents
(Current On must be greater than
125% of Current Off for automatic
sensing to work).
CIf the differential is not enough, the
user can tell unit the DUT is on by
pressing .
SAFETY ANALYZER AUTO
TURN TEST UNIT ON
Leakage Currents With DUT Power On
In this step, the Ground and Chassis Leakage Currents
are measured with the DUT turned ON. This step must
be initialized by the user to ensure that the DUT is turned
ON.
The system will sense that the power has been turned on
and continue the test, sequencing through the following
screens.
DUT
Power
ON
SAFETY SAFETY
SAFETY SAFETY
SAFETY
ANAN
ANAN
AN
ALAL
ALAL
AL
YZER--AYZER--A
YZER--AYZER--A
YZER--A
UTUT
UTUT
UT
OMAOMA
OMAOMA
OMA
TIC MODETIC MODE
TIC MODETIC MODE
TIC MODE
RUNNING AN AUTOMATIC TEST
Vista de pagina 148
1 2 ... 144 145 146 147 148 149 150 151 152 153 154 ... 161 162

Comentarios a estos manuales

Sin comentarios