STEP 6
9
NOTES:
CThe Ground Leakage Test will
measure the current with the Test
Receptacle polarity forward and
reversed (normal conditions) and
the Ground connection closed
(normal condition) and open (fault
condition).
CThe analyzer will monitor for the
maximum leakage current in both
normal and fault conditions.
Leakage Currents With DUT Power Off
In this step, the Ground and Chassis Leakage Currents
are measured with the DUT turned OFF. This step must
be initialized by the user to ensure that the DUT is turned
OFF.
SAFETY ANALYZER AUTO
TURN TEST UNIT OFF
THEN PRESS START
The unit will automatically sequence through the following
screens, after is pressed.
SAFETY SAFETY
SAFETY SAFETY
SAFETY
ANAN
ANAN
AN
ALAL
ALAL
AL
YZER--AYZER--A
YZER--AYZER--A
YZER--A
UTUT
UTUT
UT
OMAOMA
OMAOMA
OMA
TIC MODETIC MODE
TIC MODETIC MODE
TIC MODE
DUT
Power
OFF
RUNNING AN AUTOMATIC TEST